Nevis Bluff 12/03/200914/08/2010 by drillabseil, posted in Civil engineering, Queenstown Alexis Nevis 2009 We have 1500 cubic meter to remove: Scaling, drilling, blasting, scaling, drilling, blasting, scaling… Share this:LinkedInTwitterFacebookEmailPrintLike this:Like Loading... Related